Placement of pumpinstallation – Renovation Velsertunnel

Since the 15th of April 2016, the Velstertunnel is closed for renovation. Rijkswaterstaat renews all technical instalations after 60 years of operation.

For the consoritum Hyacinth (the contractor of the renovation of the Velsertunnel), Facta Pomp- en Besturingstechniek has replaced the pump for draining out rainwater. The two Gorman-Rupp pumps (each +/- 90 m³/h) are supplied, installed and tested on-site by our engineers.
 
Facta is very satisfied with its contribution to the improvement of the Velsertunnel. The tunnel will be re-opend at the beginning of 2017.  